This Traffic Impact Assessment (TIA) study was performed to determine the future growth and its resultant impact on the traffic movement in and around the vicinity of the proposed development.
This traffic study provides a traffic forecast for the proposed Kota Bharu to Kuala Krai highway located in the state of Kelantan. specifically work package 2C and 3A, which covers part of East-West Highway (FT 004), Jalan Selinsing – Kok Lanas (D136), in line with Jalan Kota Bharu – Gua Musang (FT008). The project was initiated to provide shorter journey time and at the same time spur growth within the proposed road corridor.
The aim of this study is to identify and evaluate both the direct and indirect socio-economic impacts faced by fishing communities due to the Phase 1(A)I development i.e., a 50-metre jetty expansion at Tanjung Bruas Port, specifically the livelihood of the fishermen within a 5 km radius.